Epoxy Floor Dust Sealer

Regular price
£66.30 Inc. VAT
Sale price
£66.30
Regular price
Exc. VAT
Sold out
Unit price
per 
Tax included. Shipping calculated at checkout.

Description

Solvent Free Epoxy Floor Dust Sealer Clear


Solvent Free Epoxy Floor Dust Sealer Clear is a low odour sealer suitable for concrete floors which has self-levelling properties and can be used to fill cracks and holes. Suitable for concrete floors where heavy traffic will occur.

For use on garage, industrial factory, warehouse, industrial kitchen and shop floors to provide a highly protective and hard wearing coating with excellent chemical resistance, also to be uses as a dust sealer for concrete floors.

Please note although SF Epoxy coating’s offer the best chemical resistance and protection from the elements, the colours will chalk and fade in external applications.

Please note this is not a translucent clear due to the natural colouring of the resin this does have a yellow tinge. 

 

Key Facts

Mixing ratio 4.220kg of paint to 0.780kg catalyst.
Touch Dry in 2-4 Hours.
Overcoat in 12-24 Hours
Full Dry in 7 Days
Pot life 45 minutes once catalysed.
Coverage 4 square metres per litre (this does not account for the method of application, absorption of substrate or wastage)
Low odour

Suitable for heavy traffic (vehicles)
Shelf life - 12 months from batch date

 

 

Important Information

  • Make sure the concrete is clean and any loose dust or bits have been swept or hoovered prior to painting
  • Epoxies won’t cure in temperatures below 10 degrees c. If you can add heat into the area this has to be dry heat NOT gas heat.
  • If using product to fill cracks and holes prime the area with the same product with a brush first leave it 1 hour, then poor in until effected area is filled in.

 

Mixing Epoxies

  1. Make sure you use a broom stick, mixer on a slow running drill or pallet knife to mix (An egg whisk, screwdriver or small stick that doesn’t reach the bottom of the can is not sufficient enough)
  2. Mixing should take place for 3-5 minutes allow to stand for a minute and repeat.
  3. Mix the catalyst in to tub before tipping into a paint tray
  4. Ensure all the content is properly mixed to avoid colour and or drying problems

 

New Concrete

New concrete floors or will need time to green this generally is a period of 3 months from when the concrete floor is laid, we say 3 months as it depends on the thickness of the concrete and quality, it’s always best ask the supplier and fitter of the concrete floor as to how long to wait till painting.