Two Pack Epoxy Industrial Kitchen Floor Primers

2 Colour(s) Available


  • Application By Brush Roller & Suitable Spray
  • Heavy Duty For Heavy Traffic Inc Vehicles
  • Suitable For Concrete Stone & Brick
  • Walk On Dry Time as Little as 24 Hours
  • Multi-Buy Discounts
  • Free Delivery Available

Regular price
£85.99 Inc. VAT
Sale price
£85.99
Regular price
Exc. VAT
Sold out
Unit price
per 
Tax included. Shipping calculated at checkout.
Download Our Colour Charts

Free delivery is available for this product. Order today!

Advice Line

Need more information about our products? Give us a call on 01902 954948 or email us at sales@taindustrialpaints.co.uk

This product is not suitable for the following
  • Tiles of any sort
  • Unprimed plastic
  • Bare aluminium (you will need a suitable etch primer)
  • Untreated galvanised steel (Mordant solution first)
  • A hot surface that reaches above 106 degrees (C) (you will need high temperature paints)
Disclaimer

The colours shown on the images are for guidance only. The displayed colour will depend on your monitor and browsers. The finished colour therefore may not be as shown here.

All pictures are for illustration purpose only - 1 & 2.5 Litre cans are not screen-printed cans.

Description

Description

Two Pack Epoxy Industrial Kitchen
Floor Paint Primer
Two Pack Epoxy Floor Paint Primer is suitable for use on concrete floors where heavy traffic will occur. For use on garage, industrial factory, warehouse, industrial kitchen and shop floors to provide a highly protective and hard wearing coating with excellent chemical resistance, also to be uses as a dust sealer for concrete floors.

Two Pack Epoxy is based on an epoxy resin that provides an excellent hard wearing coating once fully dry, with a mirror like gloss finish to concrete floors.

Please note although Epoxy coating’s offer the best chemical resistance and protection from the elements, the colours will chalk and fade in external applications.

 



Key Facts

Can be applied by brush & roller
Minimal operation temperature is 10 degrees
Mixing Ratio 4 parts paint to 1 part Catalyst

Once catalysed pot life of 2-3 hours

Do not pre seal the floor especially with latex or PVC sealers paint will not stick.

Easy Clean High Gloss Finish
Touch Dry 2-4 hours
Over coat 12-24 hours
Foot traffic – 24-48 hours
Cars 5 days
Full hardness, scratch & chemical resistance – 7 days
Product exhibits good chemical resistance with a high gloss easy clean
Coating will fade and chalk in external applications
Suitable for heavy traffic Like cars, forklift trucks, vans and plant
Thinners suitable T0200 Universal Thinners
Covers Approx. 8 square metres per litre (this does not account for the method of application, absorption of substrate or wastage)
Multi Application suitable for Primed Metal, Concrete, Stone & Brick

Mixing and Thinning

Make sure you use a mixer on a slow running drill, pallet knife or a broom stick that reaches the bottom of the can and mixing should take place for 3-5 mins to ensure all the content is properly mixed together to avoid colour and or drying problems.

Thinners required are T0200 Universal Thinners. If thinning is required when applying by a brush or roller start by gradually adding 5% but do not thin more an 10% as the paint won’t cover.

As our coatings are heavily pigmented separation can easily occur and you can have colour float, for example a green paint can seem blue before mixing, this is one of the reasons mixing your paint before use is essential.

 

 

Application

Step 1 - Check suitability of the product to the existing paint. We recommend you try a sample area first. Epoxies cannot be applied over single pack paints as they will attack the existing coating. Never pre seal the floor prior to painting especially with latex or PVC sealers paint will not stick.


Step 2 Clean and Abrade -

  • Make sure the existing paint is in good condition prior to painting, then lightly abrade to provide a key for good intercoat adhesion.
  • If there is flaking paint this must be removed prior to painting.
  • Ensure substrate is dry and clean of any dirt, oil, or grease.

Step 3 Prime – Once you have completed the following steps you can apply this primer

Step 4 Topcoat- 12-24 hours later apply first coat of top coat.

 



Remember do not apply Two Pack Epoxy Paint in temperatures below 10 degrees centigrade cross linking of the paint and catalyst will not take place and the coating will never fully dry.



New Concrete Floors will need time to green this generally is a period of 3-6 months from when the concrete floor is laid, we say 3-6 months as it depends on the thickness of the concrete and quality, it’s always best ask the supplier and fitter of the concrete floor as to how long to wait till painting.


Always stir your paint up well prior to using

Make sure you use a broom stick, mixer on a slow running drill or pallet knife to mix and mixing should take place for 3-5 mins to ensure all the content is properly mixed together to avoid colour and or drying problems.

As our coatings are heavily pigmented separation can easily occur and you can have colour float, for example a green paint can seem blue before mixing, this is one of the reasons mixing your paint before use is essential.

 

 

Additional Information